I have been taking the 542 detours multiple times since Irene but haven't ventured down to see exactly which bridge or bridges are out.
I was headed down that way tomorrow to do some casual wood duckin' and was wondering if I can make it to the Pleasant Mills Church if I am headed east from Nesco.
Is the bridge over the Mullica just east of the church the one that is out or is it the smaller one over the Nescochague Lake feeder ? I do know that the crossing is out on the discharge from Nescochague by the old mill.
If I go past the barricades (Local Traffic Only) at the fork to Sweetwater and continue on 542 can I make it to the church parking lot ?
Thanks in advance.
I was headed down that way tomorrow to do some casual wood duckin' and was wondering if I can make it to the Pleasant Mills Church if I am headed east from Nesco.
Is the bridge over the Mullica just east of the church the one that is out or is it the smaller one over the Nescochague Lake feeder ? I do know that the crossing is out on the discharge from Nescochague by the old mill.
If I go past the barricades (Local Traffic Only) at the fork to Sweetwater and continue on 542 can I make it to the church parking lot ?
Thanks in advance.