W. Branch river bridge is apparently OK, but the nearby E. Branch river bridge was recently downgraded from 15 ton max weight to 5 ton max. I think they just covered the "1" on the signs with white paint and slapped a "NEW" sign below. But yes, if you hit either of those bridges at 45 MPH you will probably regret it.Not that one, but the one on Stage Rd over the W Branch Bass River sure feels like its ready to let go.
That bridge is own by trollsI went across that bridge today going towards Atco and I swear I thought we were going through. Has an anyone else felt the same?
Same thing happened in Winslow in the '90's. A crane made it across but the person in the chase truck went for a ride.Speaking of old bridges, and fortunately not in our area, take a look at this story from last week in Iowa. Weight Limit 3 Ton bridge, say hello to 15+ Ton Truck. Yes I think it could happen here. The driver probably figured if he floored it he would make it across. Almost did, too.
http://www.decorahnews.com/news-stories/2017/05/16520.html
I miss Iowa. I lived there also from 1980 'till 1983, when I returned to here. I lived outside of Davenport and really enjoyed pheasant hunting, fishing, and the friendliness of the people. In Decorah, the area of the bridge accident, is a heirloom seed repository and exchange, a non profit dedicated to saving heirloom farming/ garden varieties. Coincidentally, a friend of mine from those days, is visiting us and staying overnight tonight.I like Iowa. I was there in the mid-80's going to a school. Went out in some of that country where all you could hear was an occasional cow lowing, maybe a chicken or two, and perhaps the creaking of a someone opening a screen door at a farmhouse.
Very peaceful.
They are currently planning a shutdown for repairs:Not that one, but the one on Stage Rd over the W Branch Bass River sure feels like its ready to let go.
Yes. Signs went up about a week ago at the East Branch Bass River Bridge: closed May 15. Doesn't say when the bridge will re-open, but I was told they are replacing the bridge and it will take a week.They are currently planning a shutdown for repairs:
http://www.burlingtoncountytimes.co...cle_e1fee5be-34e4-11e7-a5d9-fb9c5eb5d4a7.html